Category: Screeding guides
- Garage conversion floors: insulating and screeding to match the houseGarage floors usually sit lower than the house and often slope. Here is how the floor is built up to match.2 min read
- Preparing for screed day: a checklist for homeowners and buildersA ready site means a faster, cheaper, better screed. Use this checklist before we arrive.2 min read
- Screed vs concrete: what is the difference?Concrete is the structural slab; screed is the smooth, level layer on top. Here is why most floors need both.1 min read
- Sand and cement screed mix ratio explainedMost traditional screeds use 1 part cement to 3 to 5 parts sharp sand, laid semi-dry. Here is why it matters.1 min read
- Why does floor screed crack? Causes and how to prevent itMost screed cracks come from drying too fast, too little depth, poor compaction or missing movement joints. Here is how to prevent them.2 min read
- When can you tile on new screed?Tile when the screed is dry enough, not after a set number of days. Here is how to tell, plus the prep liquid screeds need first.2 min read
- Bonded, unbonded and floating screed: what is the difference?Bonded screeds stick to the slab, unbonded screeds sit on a membrane, floating screeds sit on insulation. Here is when each is used.2 min read
- Floor screeding cost in Essex: what changes the price?Area, depth, screed type, access and preparation drive the price of a screed. Here is how to get a fast, accurate quote.2 min read
- What to send for a fast floor screeding quotePostcode, area, depth, heating, finish, access and dates. The checklist that gets you an accurate screeding price first time.1 min read
- How long does floor screed take to dry?A typical sand and cement screed dries at roughly 1 mm a day for the first 40 mm, then much more slowly. Here is what that means for your floor.3 min read
Tell us about your floor
Send the postcode, rough floor area and what is going on top. We will come back with a price, usually the same or next working day.